HVAC invoice template
Service & CostsA fill-in service invoice or estimate with equipment, refrigerant pounds, labor and tax.
invoice · estimate
There is no published index of what a system replacement costs, so this does not pretend to know. It gives you the line items a real bid is built from and totals whatever you put in them.

Scope of work: Full system
Every figure is yours to set. There is no national price index for this work — the numbers below are placeholders to be replaced with your own quotes and rates.
$9,676
Furnace + condenser + coil — $3,225 per ton installed
| Line item | Amount | Share |
|---|---|---|
| Equipment | $4,200 | 43% |
| Labour | $2,750 | 28% |
| Materials | $850 | 9% |
| Permit | $250 | 3% |
| Disposal | $150 | 2% |
| Overhead and margin | $1,476 | 15% |
| Total | $9,676 | 100% |
Search results are full of confident national averages for replacing a system. They are aggregations of lead-generation form data, not a price index — nobody publishes one, because the same job costs wildly different amounts depending on whether the line set can be reused, whether the flue needs a liner, whether the panel has room for a heat pump, and what the shop's overhead is.
So this tool asks for your numbers. Fill it in twice — once with what you think the job involves, once with a contractor's bid broken out — and the gap tells you what to ask about.
| Line item | What to ask |
|---|---|
| Equipment | Which model numbers, and what is the AHRI reference for the matched pair? |
| Labour | How many technician-hours, and how many people on site for how long? |
| Line set | Reused or replaced? A reused set on a new refrigerant needs a documented flush. |
| Duct modifications | Was static pressure measured before the bid, or is the duct assumed fine? |
| Electrical | Does a heat pump conversion need a panel or service upgrade? Who is pulling that permit? |
| Permit | Is a mechanical permit included, and who schedules the inspection? |
| Disposal | Who recovers the refrigerant from the old unit, and is the recovery documented? |
| Overhead and margin | Not a question — but it is why two honest bids differ by thousands. |
Leave any federal credit out of the build-up: 25C covered improvements made through 2025-12-31, so a bid that still shows a federal credit line for work done now is wrong (utility and state rebates are separate — check yours directly). And if the quote is a gas furnace, gas furnaces made from 2028-12-18 must reach 95% AFUE, which brings condensing venting with it. The HVAC replacement cost guide and the tax credit guide cover both in full.
A bid far below your total usually means something is missing — no permit, no duct work, a reused line set on a system that should not have one, or equipment that does not match. A bid far above it is not automatically wrong; a company with real dispatch, a warehouse and a warranty department carries overhead that an owner-operator does not. Ask which row the difference sits in.
Before any of it, confirm the capacity being quoted is the capacity the house needs. The Manual J worksheet takes twenty minutes and has saved people from paying for a ton they did not want.
Sources: IRS, Energy Efficient Home Improvement Credit (read 2026-09-04) · 10 CFR 430.32(e)(1)(iii) (read 2026-09-04)
Replacement cost tracks the capacity you have to buy, and the climate zone is what sets that capacity. The same house needs different equipment in a mild zone and a cold one, and in the coldest zones the estimate has to carry supplemental heat or a dual-fuel furnace that a southern install never buys at all.
A fill-in service invoice or estimate with equipment, refrigerant pounds, labor and tax.
invoice · estimate
What a full system costs installed in 2026, and which line items move it.
11 min
Cost by AFUE, stage count and venting, plus the permit and liner line items.
10 min
Condenser, coil and line-set costs, and when a coil-only swap is legal.
10 min
More in Service & Costs — 6 tools, 6 guides, on SetpointKit. Or browse every HVAC calculator.